Project Title:
Elon Partners Metal Fabrication FacilityLocation:
High Point, NCSQ FOOTAGE:
14,000FEATURES:
Engineered for efficiency and durability, this facility centers around a clear-span Schulte Building Systems frame that delivers a completely unobstructed, open floor plan tailored for heavy metal fabrication. Overhead, a standing seam metal roof provides long-term weather protection and low-maintenance reliability. Along the perimeter, translucent wall panels flood the workspace with natural daylight, creating a bright, productive environment while reducing daytime energy costs.







