Charlotte Pipe & Foundry

Aggregate Building

18,000 SF pre-engineered building
featuring 35’ walls utilizing Galvalume wall and roof panel

Charlotte Pipe and Foundry Aggregate Building

Charlotte Pipe and Foundry

Charlotte Pipe and Foundry Aggregate Building

test

test

test

test

test

test

Manufacturing & Distribution Facility

  • Full printing and packaging facility with two presses. Foundations are set for future addition of two more presses.
  • Completed in 8 1/2 months—from groundbreaking to first package off the press. An early completion bonus was awarded.
  • Project required significant coordination on technical aspects of the project and major electrical requirements for Owner equipment and process.
  • Structural steel frame with precast concrete wall panels and reinforced concrete slab with single-ply mechanically fastened TPO roof.
  • Cost Plus with GMP and shared savings contract.